June 8

06/08/2023  |  Repair

As we begin the month of June, a lot more is happening with the church on Maze Blvd.'s year-long repair project. Scaffolding has been put up around the entire church. The windows just under the dome have been removed.The exterior stucco and most of the mid-level windows have been removed. In the next few weeks, all exterior stucco will be removed, bracing of the metal wall studs will begin, and the lower windows will be removed.

BACK TO LIST BACK